Case Studies
Field-Proven Combustion Projects
Real retrofits and burner applications we have commissioned — with the equipment supplied, the problem solved and the measured result on the line.
20 projects, measured results
Each study names the industry, the duty and the burner system supplied — no client names, only the engineering.
Food Processing
4 t/h Steam Boiler Retrofit for a Food Plant
4 t/h steam, 24/7 continuous
Gas saving: 8–12% vs old unit
Read case study →
Textile Dyeing & Printing
6 t/h Boiler Burner Upgrade for a Textile Dyeing Plant
6 t/h hot water / steam, dual-purpose
Load range: 20–100% continuous
Read case study →
Building Materials
10 t/h Steam Boiler for a Gypsum-Board Plant
10 t/h steam
Output: 10 t/h, full-load stable
Read case study →
Metal Coating
Linear Burner for a Powder-Coating Curing Oven
Tunnel oven, continuous line
Temp uniformity: ±1–2℃
Read case study →
Metal Heat Treatment
High-Velocity Burner for a Metal Tempering Furnace
Tempering furnace, batch heat treatment
Furnace uniformity: ±3–5℃
Read case study →
Ceramics & Refractories
Tunnel Kiln Burner Retrofit for Biscuit Firing
60 m tunnel kiln, 8 t/dayware
Zone temp: 1200C, stable profile
Read case study →
Glass Manufacturing
Low-NOx Burner for a Glass Annealing Lehr
40 m lehr, float-glass line
Curve: Within stress-relief band
Read case study →
Commercial Laundry
Tunnel Dryer Burner for an Industrial Laundry
2 t/h laundry load
Dry uniformity: No wet spots
Read case study →
Paper & Tissue
High-Velocity Burner for a Paper Dryer Section
2.5 m reel, dryer-section hood
Hood temp: Stable across speed
Read case study →
Non-ferrous Foundry
Low-NOx Burner for an Aluminum Holding Furnace
5 t holding, 24/7 cast cell
Bath temp: 720C, narrow band
Read case study →
Commercial Heating
Hot-Water Boiler Burner for a Hospital
2.8 MW, 90C hot-water loop
Supply: 90C, stable
Read case study →
Textile Finishing
Stenter Frame Oven Burner for a Textile Finishing Line
8-zone stenter, continuous fabric
Zone heat: Even, no curl
Read case study →
Ferrous Foundry
Cupola Preheat and Ladle-Drying Burner for a Foundry
3 t cupola, batch casting
Dry time: Shortened
Read case study →
Horticulture
Unit-Heater Burner for a Commercial Greenhouse
20000 m2, unit-heater banks
Zone heat: Even, no cold spots
Read case study →
Waste to Energy
Auxiliary Burner for a Waste Incineration Kiln
5 t/day, secondary chamber
Chamber: 850C held
Read case study →
Steel Rolling
Regenerative Burner for a Steel Reheating Furnace
20 t/h, pusher reheating furnace
Billet heat: 1200C uniform
Read case study →
Petrochemical
Process Heater Burner for a Chemical Stream
3 MW, process heater
Tube wall: Even, no hot spots
Read case study →
Process Heating
Thermal Fluid (Hot Oil) Heater Burner
1.2 MW thermal fluid heater
Oil temp: Stable setpoint
Read case study →
Asphalt & Bitumen
Tank-Heating Burner for an Asphalt Farm
2000 m3 tank, 160C hold
Tank temp: 160C, steady
Read case study →
Commercial HVAC
Make-Up Air Unit Burner for a Commercial AHU
50000 m3/h AHU
Supply air: Tempered, clean
Read case study →Have a combustion problem like these?
Tell us the industry, the duty and the fuel — we will shortlist burner, controls and safety chain.
Request a Quote